Summary
This website contacted 4 IPs in 1 country across 4 domains to perform 2 HTTP transactions. The main domain is web-claude-infra-2904-okx-evm-only-solana-uniswap.vercel.app and was registered NaN years ago.
Submitted URL: http://www.web-claude-infra-2904-okx-evm-only-solana-uniswap.vercel.app/
Effective URL: https://web-claude-infra-2904-okx-evm-only-solana-uniswap.vercel.app/Redirected
AI Security Verdict
Moderate Risk
Confidence: 72%
The site mimics Uniswap branding on an unranked Vercel subdomain, lacks forms, and shows no malicious activity, resulting in a moderate risk rating.
Risk Factors
Safety Factors
Details
Page Title
Uniswap | Trade Crypto on DeFi’s Leading Exchange
Scan Type
public
Language
English
Category
cryptocurrency blockchain
(88%)Domain Information
The domain name 'www.web-claude-infra-2904-okx-evm-only-solana-uniswap.vercel.app' uses the application-focused generic top-level domain (.app); it also runs on subdomain 'www.web-claude-infra-2904-okx-evm-only-solana-uniswap'. The second-level label 'vercel' is 6 characters long with two vowels and 4 consonants. Breaking it apart gives 2 words: ver, cel. Median word length comes out to 3 characters. No strong language cues emerged from the frequency lists.
Screenshot

Page Load Overview
Language Analysis
Primary Language
Detection Details
Website Classification
Primary Category
All Detected Categories
Detected Features
Domain & IP Information
| Requests | IP Address | Location | AS Autonomous System |
|---|---|---|---|
| 28 | 64.29.17.131 | United States | AS16509Amazon.com, Inc. |
| 27 | 104.18.94.41Cloudflare · WAF | United States | AS13335Cloudflare, Inc. |
| 27 | 216.198.79.195 | United States | AS16509Amazon.com, Inc. |
| 27 | 64.239.109.193 | United States | AS16509Amazon.com, Inc. |
| 109 | 4 | - | - |
Detected Technologies2
Content Similarity HashesFor malware variant detection
TLSH (Trend Micro Locality Sensitive Hash)
Specialized for malware detection and similarity analysis
ssdeep (Context Triggered Piecewise Hashing)
Detects similar content even with modifications
sdhash (Similarity Digest Hashing)
High-precisionHigh-precision similarity detection for forensic analysis
These hashes enable detection of similar websites and malware variants by comparing content similarity even when exact matches aren't found.
Image Hashes
Perceptual Hashes
Other Hashes
Scan History
Scan history not available
Unable to load historical scan data