Summary
This website contacted 3 IPs in 1 country across 2 domains to perform 6 HTTP transactions. The main domain is evm-rectification.pages.dev and was registered NaN years ago.
Submitted URL: https://evm-rectification.pages.dev/
AI Security Verdict
High Risk
Confidence: 92%
The site is flagged by Cloudflare as a phishing page and classified by ML as phishing; treat as high‑risk and do not engage.
Risk Factors
Details
Bot Protection Detected
This website is protected by Cloudflare bot protection. Our scanner was challenged or blocked during access.
Page Title
Suspected Phishing | Cloudflare
Scan Type
public
Language
English
Category
phishing scam
(92%)Domain Information
The domain 'evm-rectification.pages.dev' uses the developer-focused generic top-level domain (.dev) and includes subdomain 'evm-rectification'. The registrable portion 'pages' spans 5 characters with 2 vowels and three consonants. Word splitting yields 1 word: pages. Expect 5 characters per word on average. No strong language cues emerged from the frequency lists.
Screenshot

Page Load Overview
Language Analysis
Primary Language
Detection Details
Website Classification
Primary Category
All Detected Categories
Detected Features
Domain & IP Information
| Requests | IP Address | Location | AS Autonomous System |
|---|---|---|---|
| 2 | 104.18.94.41Cloudflare · WAF | United States | AS13335Cloudflare, Inc. |
| 2 | 172.66.44.78Cloudflare · WAF | United States | AS13335Cloudflare, Inc. |
| 2 | 172.66.47.178Cloudflare · WAF | United States | AS13335Cloudflare, Inc. |
| 6 | 3 | - | - |
Detected Technologies3
Content Similarity HashesFor malware variant detection
TLSH (Trend Micro Locality Sensitive Hash)
Specialized for malware detection and similarity analysis
ssdeep (Context Triggered Piecewise Hashing)
Detects similar content even with modifications
sdhash (Similarity Digest Hashing)
High-precisionHigh-precision similarity detection for forensic analysis
These hashes enable detection of similar websites and malware variants by comparing content similarity even when exact matches aren't found.
Image Hashes
Perceptual Hashes
Other Hashes
Scan History
Scan history not available
Unable to load historical scan data