Summary
API
This website contacted 29 IPs in 1 country across 19 domains to perform 107 HTTP transactions. The main domain is elegantthemes.com and was registered 18 years ago.
Submitted URL: https://elegantthemes.com
Effective URL:
The Cisco Umbrella rank of the primary domain is #184,263 of the top 1 million websites
AI Security Verdict
Low Risk
Confidence: 95%
Established WordPress theme vendor on its own domain. Self-branded, no impersonation, no threat-intel or malware signals; only standard member login present. Low risk.
Safety Factors (4)
Details
Page Title
The Best WordPress Themes In The World
Scan Type
public
Domain Name Analysis
Within the commercial generic top-level domain (.com), 'elegantthemes.com' is registered and has no subdomain. Count 13 characters in 'elegantthemes' with 5 vowels and 8 consonants. Segmentation suggests two words: elegant, themes. Median word length comes out to 6.5 characters. No strong language cues emerged from the frequency lists.
Screenshot

Page Load Overview
Language Analysis
Primary Language
Detection Details
Website Classification
Primary Category
All Detected Categories
Detected Features
Domain & IP Information
| Requests | IP Address | Location | AS Autonomous System |
|---|---|---|---|
| 23 | 104.16.92.42Cloudflare · WAF | United States | AS13335Cloudflare, Inc. |
| 3 | 52.222.236.60Cloudfront · CDN | United States | AS16509Amazon.com, Inc. |
| 3 | 192.178.183.97Google · CDN | United States | AS15169Google LLC |
| 3 | 104.16.80.73Cloudflare · WAF | United States | AS13335Cloudflare, Inc. |
| 3 | 104.16.91.42Cloudflare · WAF | United States | AS13335Cloudflare, Inc. |
| 3 | 52.222.236.71Cloudfront · CDN | United States | AS16509Amazon.com, Inc. |
| 3 | 52.222.236.107Cloudfront · CDN | United States | AS16509Amazon.com, Inc. |
| 3 | 142.251.14.97Google · CDN | United States | AS15169Google LLC |
| 3 | 192.178.183.94Google · CDN | United States | AS15169Google LLC |
| 3 | 65.9.130.52Cloudfront · CDN | United States | AS16509Amazon.com, Inc. |
| 107 | 29 | - | - |
Detected Technologies11
Content Similarity HashesFor malware variant detection
TLSH (Trend Micro Locality Sensitive Hash)
Specialized for malware detection and similarity analysis
ssdeep (Context Triggered Piecewise Hashing)
Detects similar content even with modifications
sdhash (Similarity Digest Hashing)
High-precisionHigh-precision similarity detection for forensic analysis
These hashes enable detection of similar websites and malware variants by comparing content similarity even when exact matches aren't found.
Image Hashes
Perceptual Hashes
Other Hashes
Scan History
Scan history not available
Unable to load historical scan data