Summary
API
This website contacted 8 IPs in 1 country across 11 domains to perform 19 HTTP transactions. The main domain is metamask-docs-p13jojaa8-consensys-ddffed67.vercel.app and was registered 6 years ago.
Submitted URL: http://metamask-docs-p13jojaa8-consensys-ddffed67.vercel.app/metamask-connect/evm/
Effective URL:
AI Security Verdict
High Risk
Confidence: 82%
Page hosts high‑severity malicious JavaScript (C2 backdoor) and has unverified phishing IoCs; treat as high‑risk malware distribution.
Risk Factors
Details
Page Title
MetaMask Connect EVM - Ethereum Dapp Integration | MetaMask developer documentation
Scan Type
public
Domain Name Analysis
The domain name 'metamask-docs-p13jojaa8-consensys-ddffed67.vercel.app' uses the application-focused generic top-level domain (.app), featuring subdomain 'metamask-docs-p13jojaa8-consensys-ddffed67'. Its registrable label 'vercel' stretches across 6 characters holding two vowels versus four consonants. Splitting it apart reveals 2 words: ver, cel. Median word length is three characters. No strong language cues emerged from the frequency lists.
Screenshot

Page Load Overview
Language Analysis
Primary Language
Detection Details
Website Classification
Primary Category
All Detected Categories
Detected Features
Domain & IP Information
| Requests | IP Address | Location | AS Autonomous System |
|---|---|---|---|
| 5 | 18.245.31.100Cloudfront · CDN | United States | AS16509Amazon.com, Inc. |
| 2 | 64.29.17.195 | United States | AS16509Amazon.com, Inc. |
| 2 | 64.239.123.65 | United States | AS16509Amazon.com, Inc. |
| 2 | 104.17.208.5Cloudflare · WAF | United States | AS13335Cloudflare, Inc. |
| 2 | 18.245.31.78Cloudfront · CDN | United States | AS16509Amazon.com, Inc. |
| 2 | 18.245.31.35Cloudfront · CDN | United States | AS16509Amazon.com, Inc. |
| 2 | 216.198.79.195 | United States | AS16509Amazon.com, Inc. |
| 2 | 18.245.31.112Cloudfront · CDN | United States | AS16509Amazon.com, Inc. |
| 19 | 8 | - | - |
Detected Technologies9
Content Similarity HashesFor malware variant detection
TLSH (Trend Micro Locality Sensitive Hash)
Specialized for malware detection and similarity analysis
ssdeep (Context Triggered Piecewise Hashing)
Detects similar content even with modifications
sdhash (Similarity Digest Hashing)
High-precisionHigh-precision similarity detection for forensic analysis
These hashes enable detection of similar websites and malware variants by comparing content similarity even when exact matches aren't found.
Image Hashes
Perceptual Hashes
Other Hashes
Scan History
Scan history not available