Summary
API
This website contacted 10 IPs in 4 countries across 12 domains to perform 247 HTTP transactions. The main domain is db-bauzeitung.de.
Submitted URL: https://db-bauzeitung.de
Effective URL:
AI Security Verdict
Safe Website
Confidence: 85%
Legitimate architecture magazine site with no apparent security concerns.
Safety Factors (3)
Details
Page Title
db deutsche bauzeitung Architekturfachzeitschrift 150 Jahre Standpunkte in der Architektur
Scan Type
public
Domain Name Analysis
Within the German country-code top-level domain (.de), 'db-bauzeitung.de' is registered and has no subdomain. The second-level label 'db-bauzeitung' is 13 characters long containing 5 vowels alongside 7 consonants, along with 1 hyphen. Tokenizing the label suggests 3 words: db, bau, zeitung. Median word length is three characters. No strong language cues emerged from the frequency lists.
Screenshot

Page Load Overview
Language Analysis
Primary Language
Detection Details
Website Classification
Primary Category
All Detected Categories
Detected Features
Domain & IP Information
| Requests | IP Address | Location | AS Autonomous System |
|---|---|---|---|
| 31 | 79.127.211.90 | Germany | AS15169GOOGLE |
| 24 | 87.230.98.78 | Germany | AS61157PlusServer GmbH |
| 24 | 195.181.170.19 | United States | AS60068Datacamp Limited |
| 24 | 104.26.2.193 | Finland | AS61157PlusServer GmbH |
| 24 | 185.111.111.155 | Sweden | AS24940Hetzner Online GmbH |
| 24 | 3.160.150.10 | Unknown | AS13335CLOUDFLARENET |
| 24 | 142.250.74.200 | Unknown | AS16509AMAZON-02 |
| 24 | 88.99.88.196 | Falkenstein, Saxony, Germany | AS24940Hetzner Online GmbH |
| 24 | 172.67.142.245 | United States | AS13335CLOUDFLARENET |
| 24 | 85.215.2.53 | Germany | AS6786Cronon GmbH |
| 247 | 10 | - | - |
Detected Technologies9
Content Similarity HashesFor malware variant detection
TLSH (Trend Micro Locality Sensitive Hash)
Specialized for malware detection and similarity analysis
ssdeep (Context Triggered Piecewise Hashing)
Detects similar content even with modifications
sdhash (Similarity Digest Hashing)
High-precisionHigh-precision similarity detection for forensic analysis
These hashes enable detection of similar websites and malware variants by comparing content similarity even when exact matches aren't found.
Image Hashes
Perceptual Hashes
Other Hashes
Scan History
Scan history not available
Unable to load historical scan data