Summary
API
Submitted URL: http://metamask-docs-git-dependabot-npmandya-95394d-consensys-ddffed67.vercel.app/embedded-wallets/connect-blockchain/evm/
AI Security Verdict
High Risk
Confidence: 72%
The page impersonates MetaMask on an unranked Vercel subdomain but lacks credential collection; treat as moderate risk.
Risk Factors (3)
Details
Page Title
Integrate Embedded Wallets with EVM Compatible Chains | MetaMask developer documentation
Scan Type
public
Domain Name Analysis
Within the application-focused generic top-level domain (.app), 'metamask-docs-git-dependabot-npmandya-95394d-consensys-ddffed67.vercel.app' is registered with subdomain 'metamask-docs-git-dependabot-npmandya-95394d-consensys-ddffed67'. The core label 'vercel' covers 6 characters containing two vowels alongside four consonants. Breaking it apart gives two words: ver, cel. The median word length lands at three characters. No strong language cues emerged from the frequency lists.
Screenshot

Page Load Overview
Language Analysis
Primary Language
Detection Details
Website Classification
Primary Category
All Detected Categories
Detected Features
Domain & IP Information
| Requests | IP Address | Location | AS Autonomous System |
|---|---|---|---|
| 8 | 216.198.79.67 | United States | AS16509Amazon.com, Inc. |
| 6 | 64.239.123.193 | United States | AS16509Amazon.com, Inc. |
| 6 | 104.17.208.5Cloudflare · WAF | United States | AS13335Cloudflare, Inc. |
| 6 | 18.245.31.112Cloudfront · CDN | United States | AS16509Amazon.com, Inc. |
| 6 | 216.198.79.195 | United States | AS16509Amazon.com, Inc. |
| 6 | 18.245.31.35Cloudfront · CDN | United States | AS16509Amazon.com, Inc. |
| 6 | 64.29.17.195 | United States | AS16509Amazon.com, Inc. |
| 6 | 104.17.207.5Cloudflare · WAF | United States | AS13335Cloudflare, Inc. |
| 6 | 64.239.123.1 | United States | AS16509Amazon.com, Inc. |
| 6 | 45.43.142.3 | United Kingdom | AS16276OVH SAS |
| 62 | 10 | - | - |
Detected Technologies9
Content Similarity HashesFor malware variant detection
TLSH (Trend Micro Locality Sensitive Hash)
Specialized for malware detection and similarity analysis
ssdeep (Context Triggered Piecewise Hashing)
Detects similar content even with modifications
sdhash (Similarity Digest Hashing)
High-precisionHigh-precision similarity detection for forensic analysis
These hashes enable detection of similar websites and malware variants by comparing content similarity even when exact matches aren't found.
Image Hashes
Perceptual Hashes
Other Hashes
Scan History
Scan history not available
Unable to load historical scan data