Security Scan Report: metamask-docs-4q672pqsp-consensys-ddffed67.vercel.app

Redirected to:
https://metamask-docs-4q672pqsp-consensys-ddffed67.vercel.app/embedded...
Site favicon
Submitted: Completed: publiccompleted
This website contacted 35 IPs in 3 countries across 24 domains to perform 1458 HTTP transactions. The main domain is vercel.app and was registered 6 years ago.

Submitted URL: http://metamask-docs-4q672pqsp-consensys-ddffed67.vercel.app/embedded-wallets/connect-blockchain/evm/

Effective URL:
https://metamask-docs-4q672pqsp-consensys-ddffed67.vercel.app/embedded...
Redirected

AI Security Verdict

Low Risk

Confidence: 72%

2
Risk Score

Vercel-hosted MetaMask developer documentation preview. No credential or payment forms, no threat-intel, YARA, or content-level IDS hits; vercel.app IDS alerts are generic hosting reputation only. Low risk.

Risk Factors (1)
Hosted on a shared Vercel preview deployment whose actual creation date cannot be determined from the platform apex registration
Safety Factors (4)
No login, password, or payment form; verified form facts show 0 credential/payment fields
Content reads as genuine technical documentation with no urgency, lures, or brand of a third party
Self-branding matches the site's own project identity (MetaMask docs / Consensys)
No safe-browsing, YARA, IoC, or phishing/malware IDS alerts; third-party scripts come from top-ranked hosts
Domain age information unavailable

Details

Page Title

Integrate Embedded Wallets with EVM Compatible Chains | MetaMask developer documentation

Scan Type

public

Domain Name Analysis

Domain 'metamask-docs-4q672pqsp-consensys-ddffed67.vercel.app' uses the application-focused generic top-level domain (.app), featuring subdomain 'metamask-docs-4q672pqsp-consensys-ddffed67'. Its registrable label 'vercel' stretches across 6 characters split between 2 vowels and 4 consonants. Tokenizing the label suggests 2 words: ver, cel. Median word length is three characters. No strong language cues emerged from the frequency lists.

Screenshot

Security scan screenshot of http://metamask-docs-4q672pqsp-consensys-ddffed67.vercel.app/embedded-wallets/connect-blockchain/evm/

Page Load Overview

40.68s
Total Load Time
10.2 MB
Total Size

Language Analysis

Primary Language

🇺🇸English
Code: en
Confidence:80%
Script:Latin
Direction:ltr

Detection Details

HTML Lang Attribute:en
Text Length:3,664 chars
Detector Agreement:80%

Website Classification

Primary Category

cryptocurrency blockchain90% confidence
Type: dynamic
Method: ml+structural

All Detected Categories

cryptocurrency blockchain
90%
technology software
79%
documentation technical
66%
finance banking
49%
corporate
35%

Detected Features

OG: website
Schema.org

Domain & IP Information

RequestsIP AddressLocationAS Autonomous System
64216.198.79.131Aws · CLOUDUnited States
AS16509Amazon.com, Inc.
41104.17.207.5Cloudflare · WAFUnited States
AS13335Cloudflare, Inc.
4164.239.109.65Aws · CLOUDUnited States
AS16509Amazon.com, Inc.
41142.251.110.97Google · CDNUnited States
AS15169Google LLC
4145.43.142.4United Kingdom
AS16276OVH SAS
41104.16.141.209Cloudflare · WAFUnited States
AS13335Cloudflare, Inc.
41104.17.223.152Cloudflare · WAFUnited States
AS13335Cloudflare, Inc.
41104.18.40.240Cloudflare · WAFUnited States
AS13335Cloudflare, Inc.
41104.16.160.168Cloudflare · WAFUnited States
AS13335Cloudflare, Inc.
41104.17.91.187Cloudflare · WAFUnited States
AS13335Cloudflare, Inc.
145835--

Content Similarity HashesFor malware variant detection

TLSH (Trend Micro Locality Sensitive Hash)

Security-focused

Specialized for malware detection and similarity analysis

T12604AC7C911098BF2525AAD7994AA3E8D007B34DC634D778E37A4B3EEE01F504666CB3

ssdeep (Context Triggered Piecewise Hashing)

Context-aware

Detects similar content even with modifications

1536:L/H58visXqqSa90GrikU1z7M/Dlo1idxwk:LP58visriYwk

sdhash (Similarity Digest Hashing)

High-precision

High-precision similarity detection for forensic analysis

sdhash:3:185403:CAlECi6EWICUFKkBsQDSgCuAIgC+THSQCEW5iCoMGUFjgAgBAEiIglCALiEA0ggkECE+VSQk5BAQiZRcGLGgSCxSBmOBtAFT

These hashes enable detection of similar websites and malware variants by comparing content similarity even when exact matches aren't found.

Image Hashes

Perceptual Hashes

Average Hash:000f839f3f7f9fde
Perceptual Hash:bc3a51c3456e653c
Difference Hash:a4b93f3674d6b816
Wavelet Hash:000583873eaf9fee
Color Hash:#821f93

Other Hashes

Crop Resistant:a4b93f3674d6b816

Scan History

Scan history not available

Unable to load historical scan data