Security Scan Report: www.wbs.eu.com

Redirected to:
https://wbs.eu.com/
Site favicon
Submitted: Sep 14, 2026, 3:59:03 AMCompleted: Sep 14, 2026, 3:59:46 AMpubliccompleted

This website contacted 4 IPs in 1 country across 4 domains to perform 80 HTTP transactions. The main domain is wbs.eu.com and was registered 14 years ago.

Submitted URL: http://www.wbs.eu.com

Effective URL:

https://wbs.eu.com/
Redirected

AI Security Verdict

Low Risk

Confidence: 60%

3
Risk Score

Vietnamese online gambling promotion site for the TIP88 betting brand with mirror links; no phishing forms, malware, or threat-intel hits, but unlicensed/illegal gambling content warrants caution.

Risk Factors
Unlicensed/offshore online gambling operation targeting Vietnamese users, where online betting is illegal
Promotes mirror/alternate access links to evade ISP blocking
Scanned domain is an unrelated third-level host (wbs.eu.com) used as a gambling funnel rather than the brand's own established domain
Safety Factors
No credential, login, or payment forms present on the page
No Indicators of Compromise, YARA malware, network IDS alerts, or Safe Browsing threats
No obfuscated credential exfiltration or cross-origin form submission detected
Verdict cited a credential/login form, but DOM analysis found no password field (real or disguised) or payment field, and no other hard signal — credential-phishing framing unsupported; risk adjusted from 5 to 3
Domain age information unavailable

Details

Page Title

TIP88 wbs – Link Trang Chủ TIP88.com Uy Tín 2026 – Tải App +88K

Scan Type

public

Domain Name Analysis

You're looking at domain 'www.wbs.eu.com' on the commercial generic top-level domain (.com) and includes subdomain 'www.wbs'. Its registrable label 'eu' stretches across 2 characters containing two vowels alongside 0 consonants. Segmentation suggests 1 word: eu. No strong language cues emerged from the frequency lists.

Screenshot

Security scan screenshot of http://www.wbs.eu.com

Page Load Overview

4.53s
Total Load Time
1.3 MB
Total Size

Language Analysis

Primary Language

🇻🇳Vietnamese
Code: vi
Confidence:80%
Script:Unknown
Direction:ltr

Detection Details

HTML Lang Attribute:vi-VN
Text Length:19,640 chars
Detector Agreement:100%

Website Classification

Primary Category

gambling betting99% confidence
Type: dynamic
Method: ml+structural

All Detected Categories

gambling betting
99%
entertainment media
59%
corporate
35%
adult content
26%

Detected Features

OG: website
Schema.org

Domain & IP Information

RequestsIP AddressLocationAS Autonomous System
20188.114.96.9Cloudflare · WAFUnited States
AS13335Cloudflare, Inc.
20188.114.97.9Cloudflare · WAFUnited States
AS13335Cloudflare, Inc.
20192.178.183.97Google · CDNUnited States
AS15169Google LLC
20216.239.32.36Google · CDNUnited States
AS15169Google LLC
804--

Detected Technologies8

Content Similarity HashesFor malware variant detection

TLSH (Trend Micro Locality Sensitive Hash)

Security-focused

Specialized for malware detection and similarity analysis

T154B28533E19504677F1ECBAD8295B368AA58B705C906AF66B0F530684998EF700F722D

ssdeep (Context Triggered Piecewise Hashing)

Context-aware

Detects similar content even with modifications

384:i5KOi4YT1Csv24mFNrkZdSZUaAsVH5kW6rS6d:i51i5oT4dZdyp3VHHF6d

sdhash (Similarity Digest Hashing)

High-precision

High-precision similarity detection for forensic analysis

sdhash:3:24010:4ogSpARmXLRCIGlxEZGAARQwFGgBLax1pQAkIaDMAEqMgAKTinIT5khBOERUgXsDAADjlAgCRswRbGgBzKhIgUDU4hKgEYML

These hashes enable detection of similar websites and malware variants by comparing content similarity even when exact matches aren't found.

Scan History

Scan history not available

Unable to load historical scan data