Security Scan Report: metamask-docs-ldkp21iks-consensys-ddffed67.vercel.app

Redirected to:
https://metamask-docs-ldkp21iks-consensys-ddffed67.vercel.app/embedded...
Site favicon
Submitted: Completed: publiccompleted
This website contacted 34 IPs in 3 countries across 24 domains to perform 1526 HTTP transactions. The main domain is vercel.app and was registered 6 years ago.

Submitted URL: http://metamask-docs-ldkp21iks-consensys-ddffed67.vercel.app/embedded-wallets/connect-blockchain/evm

Effective URL:
https://metamask-docs-ldkp21iks-consensys-ddffed67.vercel.app/embedded...
Redirected

AI Security Verdict

Moderate Risk

Confidence: 60%

4
Risk Score

Unranked vercel.app preview of MetaMask documentation; no forms, credentials, Indicators of Compromise or malware detected, but the brand-on-foreign-host and circular redirect warrant caution.

Risk Factors (4)
Brand name (MetaMask) in title and content on a hosting-platform subdomain that is not the brand's official domain — however the hostname embeds 'consensys', suggesting a Vercel preview deployment by the brand's parent company
Hosting-platform subdomain (vercel.app) with unknown creation date; unranked in Cisco Umbrella
Circular redirect between the entry and final URL
Generic Suricata abuse-reputation alerts for the vercel.app platform (informational, not a phishing/malware detection)
Safety Factors (5)
Content is technical developer documentation (Embedded Wallets / EVM chain integration), consistent with the claimed brand's real product
No credential-harvesting, payment or disguised password fields on the page
No Indicators of Compromise, JavaScript malware, kit-roster match or credential exfiltration
Cross-origin requests go to well-ranked legitimate services (HubSpot, Google Analytics, Segment, LaunchDarkly, jsDelivr) for analytics/CDN, which is normal
Links point to official GitHub repositories under the MetaMask organization
Domain age information unavailable

Details

Page Title

Integrate Embedded Wallets with EVM Compatible Chains | MetaMask developer documentation

Scan Type

public

Domain Name Analysis

The domain 'metamask-docs-ldkp21iks-consensys-ddffed67.vercel.app' uses the application-focused generic top-level domain (.app) and includes subdomain 'metamask-docs-ldkp21iks-consensys-ddffed67'. Count 6 characters in 'vercel' containing two vowels alongside 4 consonants. Breaking it apart gives 2 words: ver, cel. Average segment length settles at 3 characters. No strong language cues emerged from the frequency lists.

Screenshot

Security scan screenshot of http://metamask-docs-ldkp21iks-consensys-ddffed67.vercel.app/embedded-wallets/connect-blockchain/evm

Page Load Overview

41.59s
Total Load Time
8.5 MB
Total Size

Language Analysis

Primary Language

🇺🇸English
Code: en
Confidence:80%
Script:Latin
Direction:ltr

Detection Details

HTML Lang Attribute:en
Text Length:4,215 chars
Detector Agreement:80%

Website Classification

Primary Category

cryptocurrency blockchain79% confidence
Type: dynamic
Method: ml+structural

All Detected Categories

cryptocurrency blockchain
79%
technology software
76%
documentation technical
64%
corporate
35%
cryptocurrency
30%

Detected Features

OG: website
Schema.org

Domain & IP Information

RequestsIP AddressLocationAS Autonomous System
7464.29.17.67Aws · CLOUDUnited States
AS16509Amazon.com, Inc.
44104.17.208.5Cloudflare · WAFUnited States
AS13335Cloudflare, Inc.
4464.239.123.193Aws · CLOUDUnited States
AS16509Amazon.com, Inc.
44142.251.20.97Google · CDNUnited States
AS15169Google LLC
44104.16.141.209Cloudflare · WAFUnited States
AS13335Cloudflare, Inc.
44146.75.121.55Fastly · CDNFrankfurt am Main, Hesse, Germany
AS54113Fastly, Inc.
443.174.47.131Cloudfront · CDNUnited States
AS16509Amazon.com, Inc.
44104.17.92.187Cloudflare · WAFUnited States
AS13335Cloudflare, Inc.
44104.17.175.201Cloudflare · WAFUnited States
AS13335Cloudflare, Inc.
44104.17.128.172Cloudflare · WAFUnited States
AS13335Cloudflare, Inc.
152634--

Content Similarity HashesFor malware variant detection

TLSH (Trend Micro Locality Sensitive Hash)

Security-focused

Specialized for malware detection and similarity analysis

T1D5146C3C9110487F24367A93AA8AA3E8E047724DD630D774E27A4F7AEE01F550667CB7

ssdeep (Context Triggered Piecewise Hashing)

Context-aware

Detects similar content even with modifications

1536:Y/H58/Bs5+kSa90Gr6kUiz78/Dlo1i0xwr:YP58/Bsr6Qwr

sdhash (Similarity Digest Hashing)

High-precision

High-precision similarity detection for forensic analysis

sdhash:3:194844:AUlDAn6QFEkDmUCBRIPIrFEMQEgYRGCnzyAheGYAEeIZMUACGAwkwpDYpzTqRCAwCGUECA+DoAYChAL8YCmQJDqRAoAEgQmh

These hashes enable detection of similar websites and malware variants by comparing content similarity even when exact matches aren't found.

Image Hashes

Perceptual Hashes

Average Hash:000f839f3f7f9fde
Perceptual Hash:bc3a51c3456e653c
Difference Hash:a4b93f3674d6b816
Wavelet Hash:000587072faf9fee
Color Hash:#783a69

Other Hashes

Crop Resistant:a4b93f3674d6b816

Scan History

Scan history not available

Unable to load historical scan data