Security Scan Report: metamask-docs-keec0mi8n-consensys-ddffed67.vercel.app

Redirected to:
https://metamask-docs-keec0mi8n-consensys-ddffed67.vercel.app/metamask...
Site favicon
Submitted: Completed: publiccompleted
This website contacted 31 IPs in 2 countries across 21 domains to perform 788 HTTP transactions. The main domain is vercel.app and was registered 6 years ago.

Submitted URL: http://metamask-docs-keec0mi8n-consensys-ddffed67.vercel.app/metamask-connect/evm

Effective URL:
https://metamask-docs-keec0mi8n-consensys-ddffed67.vercel.app/metamask...
Redirected

AI Security Verdict

High Risk

Confidence: 85%

8
Risk Score

Fake MetaMask documentation on vercel.app, reported as phishing; impersonates MetaMask brand and is not the official site. Avoid interaction and report.

Risk Factors (5)
Brand impersonation of MetaMask on a non-official domain
Threat intelligence phishing reports (single-source, unverified but multiple sources)
Hosting on vercel.app with unknown subdomain creation date (shared platform)
Circular redirect (moderate signal)
IDS alerts for abused cloud hosting service (vercel.app)
Domain age information unavailable

Details

Page Title

MetaMask Connect EVM - Ethereum Dapp Integration | MetaMask developer documentation

Scan Type

public

Domain Name Analysis

You're looking at domain 'metamask-docs-keec0mi8n-consensys-ddffed67.vercel.app' on the application-focused generic top-level domain (.app); it also runs on subdomain 'metamask-docs-keec0mi8n-consensys-ddffed67'. The core label 'vercel' covers 6 characters containing two vowels alongside 4 consonants. It segments into two words: ver, cel. Median word length comes out to three characters. No strong language cues emerged from the frequency lists.

Screenshot

Security scan screenshot of http://metamask-docs-keec0mi8n-consensys-ddffed67.vercel.app/metamask-connect/evm

Page Load Overview

3.84s
Total Load Time
5.4 MB
Total Size

Language Analysis

Primary Language

🇺🇸English
Code: en
Confidence:80%
Script:Latin
Direction:ltr

Detection Details

HTML Lang Attribute:en
Text Length:5,100 chars
Detector Agreement:80%

Website Classification

Primary Category

cryptocurrency blockchain60% confidence
Type: dynamic
Method: ml+structural

All Detected Categories

cryptocurrency blockchain
60%
technology software
50%
corporate
35%
cryptocurrency
30%
documentation technical
28%

Detected Features

OG: website
Schema.org

Domain & IP Information

RequestsIP AddressLocationAS Autonomous System
3864.29.17.3Aws · CLOUDUnited States
AS16509Amazon.com, Inc.
25216.198.79.3Aws · CLOUDUnited States
AS16509Amazon.com, Inc.
25104.17.207.5Cloudflare · WAFUnited States
AS13335Cloudflare, Inc.
2564.239.123.1Aws · CLOUDUnited States
AS16509Amazon.com, Inc.
25142.250.154.97Google · CDNUnited States
AS15169Google LLC
25146.75.121.55Fastly · CDNFrankfurt am Main, Hesse, Germany
AS54113Fastly, Inc.
253.174.47.131Cloudfront · CDNUnited States
AS16509Amazon.com, Inc.
25104.18.30.173Cloudflare · WAFUnited States
AS13335Cloudflare, Inc.
25104.16.140.209Cloudflare · WAFUnited States
AS13335Cloudflare, Inc.
25104.17.223.152Cloudflare · WAFUnited States
AS13335Cloudflare, Inc.
78831--

Content Similarity HashesFor malware variant detection

TLSH (Trend Micro Locality Sensitive Hash)

Security-focused

Specialized for malware detection and similarity analysis

T1E2D31F39815089BE69326A97AD5EA3E8D017724DD230D674F37E4B3AEF41F504226CB3

ssdeep (Context Triggered Piecewise Hashing)

Context-aware

Detects similar content even with modifications

1536:U/H58a4sTvqqSa90GrikUgz7qeAe9e3iLwy:UP58a4sTziawy

sdhash (Similarity Digest Hashing)

High-precision

High-precision similarity detection for forensic analysis

sdhash:3:136371:zWUICU+gBYQJgjEoQUpSBAtBKJiBnEAxE6ShYakAImgAokJsMXEACMUAFAAsIJMhOoIpAAhjUIgZHBLWQAMoEQRrAAqSrIge

These hashes enable detection of similar websites and malware variants by comparing content similarity even when exact matches aren't found.

Image Hashes

Perceptual Hashes

Average Hash:10df83c78383dfc3
Perceptual Hash:bc4ac322658a757b
Difference Hash:a0b13fb6a6b6b2a6
Wavelet Hash:001fc3c78387dfc3
Color Hash:#7982d2

Other Hashes

Crop Resistant:a0b13fb6a6b6b2a6

Scan History

Scan history not available

Unable to load historical scan data