Security Scan Report: metamask-docs-keec0mi8n-consensys-ddffed67.vercel.app

Site favicon
Submitted: Completed: publiccompleted
This website contacted 31 IPs in 3 countries across 22 domains to perform 1452 HTTP transactions. The main domain is vercel.app and was registered 6 years ago.

Submitted URL: https://metamask-docs-keec0mi8n-consensys-ddffed67.vercel.app/embedded-wallets/connect-blockchain/evm/

AI Security Verdict

High Risk

Confidence: 78%

8
Risk Score

MetaMask developer-docs lookalike hosted on a free Vercel subdomain, flagged as phishing by PhishDestroy/OpenPhish and by IDS abused-service alerts; no credential form, but treat as untrusted.

Risk Factors (5)
Content-malware phishing indicators of compromise tied to the primary domain (single-source, unverified)
Impersonation of the MetaMask brand on a domain that is not MetaMask's official property
Free/shared Vercel subdomain whose actual creation date is unknown
IDS alerts flagging vercel.app as a commonly actor-abused hosting service
Circular redirect consistent with cloaking/redirection manipulation
Domain age information unavailable

Details

Page Title

Integrate Embedded Wallets with EVM Compatible Chains | MetaMask developer documentation

Scan Type

public

Domain Name Analysis

Within the application-focused generic top-level domain (.app), 'metamask-docs-keec0mi8n-consensys-ddffed67.vercel.app' is registered and includes subdomain 'metamask-docs-keec0mi8n-consensys-ddffed67'. The registrable portion 'vercel' spans 6 characters containing two vowels alongside 4 consonants. Segmentation suggests two words: ver, cel. The median word length lands at 3 characters. No strong language cues emerged from the frequency lists.

Screenshot

Security scan screenshot of https://metamask-docs-keec0mi8n-consensys-ddffed67.vercel.app/embedded-wallets/connect-blockchain/evm/

Page Load Overview

29.39s
Total Load Time
10.5 MB
Total Size

Language Analysis

Primary Language

🇺🇸English
Code: en
Confidence:80%
Script:Latin
Direction:ltr

Detection Details

HTML Lang Attribute:en
Text Length:3,664 chars
Detector Agreement:80%

Website Classification

Primary Category

cryptocurrency blockchain90% confidence
Type: dynamic
Method: ml+structural

All Detected Categories

cryptocurrency blockchain
90%
technology software
79%
documentation technical
66%
finance banking
49%
corporate
35%

Detected Features

OG: website
Schema.org

Domain & IP Information

RequestsIP AddressLocationAS Autonomous System
7264.29.17.3Aws · CLOUDUnited States
AS16509Amazon.com, Inc.
46104.17.208.5Cloudflare · WAFUnited States
AS13335Cloudflare, Inc.
4664.239.123.1Aws · CLOUDUnited States
AS16509Amazon.com, Inc.
46142.250.154.97Google · CDNUnited States
AS15169Google LLC
4645.43.142.3United Kingdom
AS16276OVH SAS
46146.75.121.55Fastly · CDNFrankfurt am Main, Hesse, Germany
AS54113Fastly, Inc.
463.174.47.131Cloudfront · CDNUnited States
AS16509Amazon.com, Inc.
46104.18.31.173Cloudflare · WAFUnited States
AS13335Cloudflare, Inc.
46104.16.140.209Cloudflare · WAFUnited States
AS13335Cloudflare, Inc.
46104.17.223.152Cloudflare · WAFUnited States
AS13335Cloudflare, Inc.
145231--

Content Similarity HashesFor malware variant detection

TLSH (Trend Micro Locality Sensitive Hash)

Security-focused

Specialized for malware detection and similarity analysis

T180049C3D911098BF68256AD3A95EA3E8D007B34DD230DA74E3B94B3AEF01F544566CB3

ssdeep (Context Triggered Piecewise Hashing)

Context-aware

Detects similar content even with modifications

1536:G/H58ajsZqqSa90GrikU1z7M/Dlo1idLNv:GP58ajsxiGNv

sdhash (Similarity Digest Hashing)

High-precision

High-precision similarity detection for forensic analysis

sdhash:3:185191:RgyG2BgAECtByUAkAAJwLQAQKLYxBVBk0SAKIEgCJ4FZAxEaAEAQs9NGUAOFMFBIBATQBsqCgL2YDSUhAAgGhhIgWQUEoF5A

These hashes enable detection of similar websites and malware variants by comparing content similarity even when exact matches aren't found.

Image Hashes

Perceptual Hashes

Average Hash:000f839f3f7f9fde
Perceptual Hash:bc3a51c3456e653c
Difference Hash:a4b93f3674d6b816
Wavelet Hash:000583873eaf9fee
Color Hash:#4f783a

Other Hashes

Crop Resistant:a4b93f3674d6b816

Scan History

Scan history not available

Unable to load historical scan data